Turnaround and Shutdown

Job / Work Description

Client Company

Year

Provision of Defect Piping and Associated Work for Turnaround And Project(TANP) 2014 inclusive of overall planning, supervision, scheduling and co-ordination of all works including office support, mobilization and demobilization of staff, materials, tools & equipment and execution and completion of work until acceptance by client.

Petronas Penapisan (Terengganu) Sdn.Bhd.

2014

 KR2B Shutdown 2014 – Worked essentially involves the management, skilled manpower, supervision, safety coordination, tools, equipment, materials, consumables and transportation to carry out the defect piping work for Petronas Penapisan (Terengganu) Sdn.Bhd.

UBF Maintenance Sdn.Bhd.

2014

Replacement of Underground Firewater Piping to Glass Fibre Reinforced Plastic (GRP) at Gas Processing Plant, Complex A, Plant Operation Division, Petronas Gas Berhad.

Petronas Gas Berhad-Complex A

2013

CRU Shutdown 2013 – Worked essentially involves the management, skilled manpower, supervision, safety coordination, tools, equipment, materials, consumables and transportation to carry out the defect piping work.

Petronas Penapisan (Terengganu) Sdn.Bhd.

2013

Procurement, Construction, Installation and Commissioning of Piping, Civil and Structural Items for New E1107 CRU Packinox Replacement Project at Petronas Penapisan (Trg) Sdn Bhd

Petronas Penapisan (Terengganu) Sdn.Bhd.

2013

CRU Packinox Rectification & Regeneration 2012 – CRU Shutdown 2012 – Work essentially involves the management, skilled manpower, supervision, safety coordination, tools, equipment, materials, consumables and transportation to carry out the defect piping work.

Petronas Penapisan (Terengganu) Sdn.Bhd.

April 2012

Defects Piping Works for CFU Shutdown 2012 – Worked involves the management, skilled manpower, supervision, safety coordination, tools, equipment, materials, consumables and transportation to carry out the defect piping work.

Petronas Penapisan (Terengganu) Sdn.Bhd.

June 2012

Defects Piping Works for CDU Shutdown 2012 – Worked involves the management, skilled manpower, supervision, safety coordination, tools, equipment, materials, consumables and transportation to carry out the defect piping work.

Petronas Penapisan (Terengganu) Sdn.Bhd.

Sep 2012

AFC E-101 Structure Repair consists of replacement of handrail, grating & plenum plate including fan cover/guard and fan ring complete with maintenance painting structure beam during CDU Shutdown 2012

Petronas Penapisan (Terengganu) Sdn.Bhd.

Sep 2012

Defects Piping Work for Area 1 TANP 2011 (PPTSB Major Turnaround 2011) – Work essentially involves the management, skilled manpower, supervision, safety coordination, tools, equipment, materials, consumables and transportation to carry out the defect piping work.

Petronas Penapisan (Terengganu) Sdn.Bhd.

2011

Engineering, procurement, construction and commissioning in design the new piping and air intake compartment for new air purge system for ESP#1 , new bottom FRP Ducting from ESP#2 flange to the first floor flange as per drawing and design the heat exchanger system.

Tioxide (Malaysia) Sdn.Bhd.

2011

The Design, Fabrication, Supply, Delivery and Installation of Glass Reinforced Plastic (GRP) Underground and above Ground Piping for Replacement of Defect Sea Water Piping for PML TA 2009

Petronas Methanol Labuan

2009

Redesign Acid & Caustic System per PRA Project – Civil Foundation, Mechanical Piping, Build wall, construction works, tanks & structural.

Petronas Gas Berhad-GPP B

2009

Rubber Lining

Job / Work Description

Client Company

Year

Fabrication and testing of rubber lined pipes and fittings

VCM

February 2004

Rubber Lining of Lime Slurry tank at Tioxide plant

Tepat Teknik

April 2004

Supply and deliver rubber lining for Tetra Dilution Tank

Tepat Teknik

July 2004

Rubber Lining precip pulp tank at Tioxide plant

Mushtari

July 2004

Rubber Lining Work gipson feed tank c/w nozzles

Tepat Teknik

January 2005

Supply mpower, tools, equipment for Rubber Lining of Zirc. Filter Feed Tank (259/006)

Tioxide

Marc 2011

Supply mpower, tools, equipment for Rubber Lining at Nuclai Preperation Tank no 2 (TK/21/241/005/1)

Tioxide

Marc 2011

To supply manpower, material, tool, cosumables and equipment for Ruber Lining work at Crytilizer TK/11/228/004/01/XTALLISER1

Tioxide

Marc 2011

To Supply Manpower, materials, tools, consumables & equipment for rubber lining job at Storage Reduced Liquor (TK/11/216//013/01/TANK1)

Tioxide

Oct 2011

New Lining of Tank 241/016 Dilute Tetrachloride Stock Tank

Tioxide

2011

Relining of Tank 239/006 Dilute Tetrachloride Stock tank

Tioxide

2011

Relining of Tank 256/001 Primary Leaching Tank

Tioxide

2011

Lining Repair of Tank 191/253/005 Preleach Wash Water Tank

Tioxide

2011

Lining Repair of Tank 230/002 Copperas Overflow Stock Tank

Tioxide

2011

To supply manpower, consumable, non-consumable, tools, equipments and transportation to carry out Rubber Lining work for new12 unit manhole & cover at HTMAS Plant.

UBF

2012

Tank 243/T001 (New Lining) – Precipitation Tank
Tank 219/011 (New Lining) – Under Flow Tank
Tank 262/002 (Repair Lining) – Additione Pulp Stock Tank
Tank 234/001 (New and Repair Lining) – Liquor Filter Feed Tank

MMAG

2012

Tank 219/002/01 Settle No.3
Tank 234/12/01 Precoat Make Up Tank
Tank 408/005/01 Dilution Lime Stone No.1

Tioxide

2012

Rubber Lining for Mist Eliminator 1 & 2

Tioxide

2012

Relining of Tank 243/005 Precipitation Pulp Storage Tank

Tioxide

2012

Civil / Structural Works Section

Job / Work Description

Client Company

Year

Provision of manpower, materials, tools & equipment and consumables to perform road resurfing work for access from Gate No.7 to KR-2 Plant area.

Petronas Penapisan (Terengganu) Sdn.Bhd.

2014

Provision of manpower, equipment and others to repair and install new fire proofing at LPG Sphere Tank D-982. KR-1 Area

Petronas Penapisan (Terengganu) Sdn.Bhd.

2014

Provision of manpower, equipments and others to demolished old radar tower at KR-1 Area.

Petronas Penapisan (Terengganu) Sdn.Bhd.

2013

Procurement, Construction, Installation and Commissioning of Piping, Civil and Structural Items for New E-1107 CRU Packinox Replacement Project at PPTSB

Petronas Penapisan (Terengganu) Sdn.Bhd.

2013

Procurement, Construction & Commissioning E-1107 Pre-Cast Foundation Work for PPTSB

Petronas Penapisan (Terengganu) Sdn.Bhd.

2013

Provision of manpower, equipments & Machineries, Materials and consumables to perform road repair at TTLR according to work scope provided at KR-1 Area.

Petronas Penapisan (Terengganu) Sdn.Bhd.

2013

Provision of manpower, equipments and others to cleaning pump basement and lay new crusher run at Z-9105, KR-1 Area.

Petronas Penapisan (Terengganu) Sdn.Bhd.

2013

Provision of manpower, equipments and others to fabricate new shed at TA Store.

Petronas Penapisan (Terengganu) Sdn.Bhd.

2013

Provision of manpower, equipments and others to repair gutter at cleaning bay KR-2 and roofing at Pumphouse C at KR-1, OMS Area.

Petronas Penapisan (Terengganu) Sdn.Bhd.

2013

P2 KR2B Fire Proofing and Structural Repair Work, Petronas Penapisan (Terengganu) Sdn Bhd

Petronas Penapisan (Terengganu) Sdn.Bhd.

2013

Provision of manpower, equipments and others to lay crusher run for tankage drainage at Tank D-920, D-919, D-901, D-957 & D-941, KR-1 Area.

Petronas Penapisan (Terengganu) Sdn.Bhd.

2013

Provision of manpower, equipments and others to perform road shoulder at D-916, KR-1 Area.

Petronas Penapisan (Terengganu) Sdn.Bhd.

2013

Provision of manpower, equipments and others to buried sand at Nearby D-903, KR-1 Area.

Petronas Penapisan (Terengganu) Sdn.Bhd.

2013

Provision of manpower, equipments and others to fabricate 12 nos ramp for OMS BT3 Area.

Petronas Penapisan (Terengganu) Sdn.Bhd.

2013

Provision of manpower, equipments and others to repair damaged ladder cage at E-21102-3, CFU Area.

Petronas Penapisan (Terengganu) Sdn.Bhd.